Hotel lighting project
ATD specialists participated in a large hotel construction project, which includes a clinic, rooms, a gym, a restaurant, a kindergarten and much more.
We were involved at the stage of selection of lighting equipment. We were faced with the following tasks:
• Form a commercial offer according to the existing design project and budget (more than 30 different items);
• Prepare files for implementation of lighting calculations;
• Develop a logistics plan for the supply of equipment in a short time;
• Prepare samples for agreement with the customer;
• Carry out a check of the EOM of the project;
• Deliver fixtures to the facility within the specified time.
As a result, we managed to cope with all the tasks set. Some luminaires were created in the shortest possible time according to the specified characteristics.